Its table will be mated to its bed ways with Moglice moldable low-friction material.
The adhesion surfaces on the bottom of the table are roughened and cleaned. Pre-cured Moglice shims .065" thick are SuperGlued to the adhesion surface. The shims are scraped and/or filed to achieve the correct alignment of the table in relation to the bed ways.
The bed ways are sprayed with release agent and Moglice is mixed and poured into the bottom vees.
A minute or two is allowed for the Moglice to find its own level. Notice the dams made out of cardboard.
The table is then set down onto the Moglice. It squeezes up the sides and alignment of the table is verified again.
18-24 hours later the table is removed revealing finished ways. These ways should be oil grooved and spotted for oil retention. IT IS NOT NECESSARY TO SCRAPE OR MACHINE CURED MOGLICE BEARING SURFACES.
Note that the Moglice alignment shim is visible on the Moglice bearing surface.